UA RU EN

Changes in public transport routes in Dnipro due to track and water supply repairs on July 24

Зміни в курсуванні громадського транспорту в Дніпрі через ремонт колій та водопостачання 24 липня. Photo: Відомо

On July 24 in Dnipro, some buses, trams, and trolleybuses will operate on altered routes. The restrictions were introduced due to the repair of the water supply, storm sewage, and tracks at several sites. Passengers are advised to check the routes in advance. Reports indicate this from 'Vidomo'.

How buses operate on Kryvorizka Street in Dnipro on July 24

On Kryvorizka Street, a section between Robocha Street and Metallurhiv Avenue has been closed. Here, KP 'Dniprovodokanal' is repairing the water pipeline. Due to the restrictions, buses have changed their routes:

  • No. 55 and No. 75 will go via Arabatska, Klienova, and Robocha;

  • No. 156 will operate via Arabatska, Klienova, Robocha, and Kryvorizka;

  • No. 146A and No. 146B combined into one route.

The final stops of the combined route are located on Robocha near Klienova and near the intersection of Kryvorizka with Metallurhiv Avenue.

Which routes changed on Bohdan Khmelnytsky Avenue

At the intersection of Bohdan Khmelnytsky Avenue and Chornykh Zaporiztsiv Street, the second stage of track repair is ongoing. Tram No. 16 is temporarily out of service, while No. 12 runs from Staromostova Square only to Sikorskoho Street.

Trolleybuses No. 8 and No. 9 go to Denys Kotenko Street without entering the Metalo-Vyrobiv Plant. Buses No. 32, No. 32K, No. 33, No. 34, No. 106, No. 127, and No. 136 diversion their route through Krasnopilska and Chornykh Zaporiztsiv.

Buses No. 18, No. 55, and No. 151A have also been redirected to Krasnopilska. The final stop No. 85 has been moved to the building at Chornykh Zaporiztsiv, 2A, while No. 136A has been relocated from Inzhenerna to Bohdan Khmelnytsky Avenue, 123.

The stop 'PK Shynnyk' heading from the village of Myrno has now been moved to before the intersection with Chornykh Zaporiztsiv Street.

How transport operates on the Old Bridge on July 24

Due to track repair on the Old Bridge, trams No. 6 and No. 9 have been stopped. Instead, passengers are transported by buses No. 6K and No. 9K, which duplicate the tram routes. The fare is 10 hryvnias.

The passage for vehicles over the bridge has not been closed. The roadway is narrowed only near the active work area, so delays and slower traffic may occur in this area.

Recall that on June 29, Russia struck Zaporizhzhia and Dnipro, targeting civil transportation and businesses.