UA RU EN

Partial Closure of the Northern Bridge in Kyiv for Five Days

Часткова зупинка роботи Північного мосту в Києві на п'ять днів.

Traffic Restrictions in Kyiv

From July 2 to 6, traffic on the Northern Bridge in Kyiv will be partially restricted due to repair work. Specifically, the work will begin on July 2 at 10:00 and will last until July 6 at 07:00. The repair section of the bridge is directed towards the residential area of Troieshchyna. During the repairs, traffic towards Troieshchyna will be organized in the first (outermost right) and second lanes, while traffic towards the Pochayna metro station will be organized in the first, second, and third lanes. The road surface of the bridge is planned to be renovated.

In addition, there is ongoing capital renovation of Valeriy Lobanovskyi Avenue in Kyiv. The first stage of repairs covers the section from Mykola Krivonos Street to Andrii Holovko Street (even side). Complete completion of the capital repairs of the avenue is planned within the next year. Temporary traffic restrictions on the overpass through the tram tracks on the Great Ring Road are also in effect until August 20, where large-scale structural repairs are starting. During these works, passage is restricted in the first and partially in the second lanes towards Lytovskyi Avenue.

Repair Works and Restrictions

Moreover, until August 1, traffic on Roman Shukhevych Avenue in the Desnianskyi district is partially restricted. Repair works in this section are conducted daily from 9:00 to 18:00, and the repair section covers from the bridge over the Desenka River to Bratislavska Street towards Troieshchyna. The work on Shukhevych Avenue is being carried out by specialists from the Desnianskyi Road Repair and Maintenance Department.

Amid the repair works in Kyiv, temporary restrictions on the movement of heavy vehicles are also in effect due to elevated temperatures exceeding +28 °C. The ban applies to heavy transport with an actual weight exceeding 24 tons or with a load per axle of more than 7 tons. The decision on restrictions for trucks was made by Kyivavtodor.

The repair works in Kyiv involve significant traffic restrictions on several key transport arteries, which may affect vehicle traffic in the city. Given the ongoing work on the Northern Bridge and other sections, drivers are advised to plan their routes in advance and consider possible delays. Synchronization of repair works may be important for reducing negative impacts on the city's transport system.

In addition to the ongoing repairs on the Northern Bridge, similar traffic disruptions are occurring throughout Kyiv. For more details on the upcoming maintenance work and its impact on local traffic, you can read about the scheduled partial closures in the city that are set to affect several major routes.