UA RU EN

Enemy shelling in Kirovohrad region: which trains are delayed

Атаки ворога в Кіровоградській області: інформація про затримки потягів Photo: glavcom.ua
As a result of enemy shelling and damage to infrastructure in the Kirovohrad region, several trains are running with delays. This is reported by 'Glavkom' citing 'Ukrzaliznytsia'.


#54 Odesa – Dnipro; #254 Odesa – Kryvyi Rih; #51 Odesa – Zaporizhzhia; #128 Lviv – Zaporizhzhia; #92 Odesa – Kramatorsk.



You can monitor the delay times on the 'Ukrzaliznytsia' website.



Track repair in Prykarpattia


Recall that at night, Russian strike drones attacked infrastructure in the Kirovohrad region. A fire broke out at the impact site.


From September 28, track and adjacent railway infrastructure repairs will be carried out in certain areas of Prykarpattia. This will lead to temporary changes in the routes and schedules of several trains.



It has been reported that as a result of enemy shelling and damage to infrastructure in the Kirovohrad region, several trains are running with delays. Track repair is also planned in Prykarpattia, which will lead to temporary changes in train movements.