☰
✕
UA RU EN

Kiev Begins Construction of Eight Pontoon Crossings Over the Dnipro; Southern Bridge Traffic to Resume Within 2–3 Months

Kiev Begins Construction of Eight Pontoon Crossings Over the Dnipro; Southern Bridge Traffic to Resume Within 2–3 Months

Rebuilding the Southern Bridge in Kiev

Traffic on Kiev’s Southern Bridge is expected to be restored within two to three months. The bridge was temporarily closed in both directions following damage sustained during an attack on October 27. To maintain connectivity across the Dnipro River during repairs, authorities have initiated the construction of eight pontoon crossings. Two of these temporary bridges are already underway, with one designed to support up to 130 vehicles daily.

The restoration work on the Southern Bridge is funded by the city’s budget. Kiev city officials have allocated 1 billion hryvnias for building these combined water crossings and improving access roads. According to Mykola Kalashnyk, "These are fully functional, rapidly assembled bridges constructed over the Dnipro River, starting with supports and followed by laying the roadway." This effort is part of a broader initiative to strengthen the city’s transport infrastructure amid ongoing challenges.

Impact of the October 27 Attack and Safety Measures

The attack on October 27 resulted in 14 injuries, with nine people hospitalized, and claimed the life of a 46-year-old woman. The city’s metro system also suffered damage: restrictions have been imposed on the red and green lines. Specifically, the green line operates only between Syrets and Vydubychi stations, while the segment from Vydubychi to Chervonyi Khutir remains closed, with stations along this route serving as shelters.

To improve transportation options, a temporary bus route has been launched, and bus frequencies have increased on routes crossing the Darnytskyi Bridge. The Ukrainian government is receiving international assistance from the United States and Japan for the construction of these crossings, with France also being considered as a potential partner. According to Serhiy Koretskyi, "The government has tasked the Ministry for Restoration, Infrastructure, and Transport with accelerating the repair of the Southern Bridge, damaged by the missile strike on the night of October 27."

The locations for the pontoon crossings are being determined by military command and approved by the Kiev City Military Administration (KCMA). Construction of the pontoon bridges could last up to three months.

Restoring the Southern Bridge marks a crucial step in enhancing Kiev’s transportation network, particularly given the ongoing impacts of conflict in the area. These temporary pontoon crossings will help alleviate pressure on alternative routes and sustain mobility for residents. The involvement of international partners highlights global solidarity and support for Ukraine’s recovery efforts amid the aftermath of conflict.

In light of the ongoing repairs and the recent attack that affected the Southern Bridge, it's essential to stay informed about the traffic restrictions on the Southern Bridge during this critical period. Understanding these changes will help residents and commuters navigate the city more effectively as infrastructure improvements are underway.